Small Boring Unit Projects PDF Print E-mail

Project: Clear Creek Sewer
Dates: August 13, 2009 to October 09, 2009
Location: I-40 West of Babbitt Dr.
Owner: Consolidated Inc.
Contractor: Eagle Mountain Construction
Description: 300' of 36" x .500 for a 10" gravity sewerline under I-40 west bound.
Challenges: Test pits revealed limestone
Method: 36" SBU-M
Results: Completed project successfully on schedule
9073N_EMC_I_40_W._Bound_8_26_09_001.jpg 9073N_EMC_I_40_W._Bound_8_26_09_003.jpg 9073N_EMC_I_40_W._Bound_8_26_09_004.jpg


Project: Fort Tuthill Utility Corridor
Dates: March 31, 2009 to June 30, 2009
Location: I-17 & Pulliam Road
Owner: City of Flagstaff
Contractor: Eagle Mountain Construction
Description: 500' of 36" x .50 wall under I-17 for 20" DIP waterline. Anticipated solid Limestone
Challenges: Encountered veins of brown clay causing plugging issues for the SBU-A
Method: Small Boring Unit (SBU)
Results: Completed project successfully on schedule
9046N_Eagle_Mountain_Constr._I_17___Pulliam_Rd_337_exit_Race_Track_4_15_09_008__1_.jpg 9046N_Eagle_Mountain_Constr._I_17___Pulliam_Rd_337_exit_Race_Track_4_15_09_008__7_.jpg 9046N_Eagle_Mtn_Constr_I17___Pulliam_Rd_Flagstaff_4_21_09_002.jpg


Project: QWEST Fiber Optics Installation
Dates: January 10, 2008 to March 14, 2008
Location: I17 & Dixiletta
Owner: QWEST Communications
Contractor: Pauley Construction
Description: Installed over 200' of 24" casing for fiber optics.
Challenges: Cemented cobbles and hard caliche soil conditions.
Method: Small Boring Unit (SBU)
Results: Using the SBU, SSC was able to extend the capabilities of the auger bore machine and cut through hard rock, which otherwise would have required a hand-dig. The SBU increased production ten-fold.