Project: Western Waterworks
Dates: September 4, 2007 to November 9, 2007
Location: Loop 101 & 7th Street underpass.
Owner: City of Phoenix Engineering & Architectural Services
Contractor: SSC
Description: Dug a 42" OD hand tunnel along a 340' canal to install a 18" OD casing fore new waterline.
Challenges: 2'-3' boulders in the path of the waterline.
Method: Hand tunnel remoiving soil and jack and casing.
Results: Job finished ahead of schedule. Accurate within line & grade.